SINCE

1959

Manufactured for the quay upgrading project of GPMD ( Grand Port Maritime de Dunkerque) has been successfully finished

TIME:2019-01-22 AUTHOR:TAIHONG VISITS:696

 Installation of fenders that we have manufactured for the quay upgrading project of GPMD ( Grand Port Maritime de Dunkerque) has been successfully finished by December 2018 at Port of Dunkirk.  The project includes 94 sets of fender system with frontal panel in length 7.5m and width 2m, each panel connects to two cone fenders of 1000H.  The installation will allow Port of Dunkirk to accept larger container vessels from such as CMA-CGM.


PRODUCT
PRODUCT LIST